Utility Development Group
Current Standards
St. Johns County Utility Department (SJCUD) Development Group is responsible for overseeing the planning, design, and construction of new water, sewer and reclaimed infrastructure within the County’s Utility Service Area. All utility work must be approved by SJCUD prior to commencement of construction. Listed below are the manual, materials, details, and forms used by the Development group.
Planning
To request as-builts, please send an email to SJCUDAvailability@sjcfl.us, detailing project location and any other pertinent information.
Design
Standard Details
For comments / questions about the Manual, please contact the Development Engineer.
Construction Forms
Inspection Report Forms
Project Close-Out Documentation
3A – Interim Service Agreement
3B – Close out – Backflow Preventer Certification
3C – Close out – Release of Lien
3D – Close out – Schedule of Values – PDF | XLSX (Excel)
3G – Close out – Electronic As-built Drawing Submittal
3H – Close out – As-built Drawing Certification
3I – Close out – Special Warranty Deed
3J – Close out – Easement (Request from SJCUD Project Inspector)